Tripomatic

Baku–Tbilisi–Ceyhan pipeline

The Baku–Tbilisi–Ceyhan pipeline is a 1,768 kilometres long crude oil pipeline from the Azeri–Chirag–Gunashli oil field in the Caspian Sea… Read more…

Tags bp
Baku–Tbilisi–Ceyhan pipeline
National Bank of Georgia / Public domain
 

The Baku–Tbilisi–Ceyhan pipeline is a 1,768 kilometres long crude oil pipeline from the Azeri–Chirag–Gunashli oil field in the Caspian Sea to the Mediterranean Sea. It connects Baku, the capital of Azerbaijan and Ceyhan, a port on the south-eastern Mediterranean coast of Turkey, via Tbilisi, the capital of Georgia. It is the second-longest oil pipeline in the former Soviet Union, after the Druzhba pipeline. The first oil that was pumped from the Baku end of the pipeline reached Ceyhan on 28 May 2006.

Source: Wikipedia

More information and contact

Address Georgia
Coordinates 41°38'55.619" N, 44°0'22.069" E
QR code
Scan to download the app

Plan Your Perfect Trip

Create day-by-day itineraries, discover top attractions, and navigate with ease — on any device.

Or search for Tripomatic in the App Store or Google Play.

More interesting places